Bradmill Yarraville:

Master planned community, Francis St Yarraville, Victoria

Bradmill Yarraville Project Partners

Frasers Property

Frasers Property bought the 26-hectare property to develop a large residential precinct on this heavily contaminated site. They required additional skill sets to those already in-house to create the best possible value from this complex project. 

Development Director Services

Reporting to the Director of Infrastructure and Project Development, Urban Neighbourhoods provided client-side Development Director services. This included strategy development and advice on demolition and remediation of the site, resulting in a 2-year clean-up and refilling process.

This remediation was complex and required extensive cleanup and risk mitigation of asbestos and PFAS contamination in the buildings, soil and groundwater.

Specific services provided included strategic advice and management of:

the demolition, integrated remediation and geotechnical solutions

heavy infrastructure, demolition, remediation of soil, chemical, groundwater and building contaminants

civil and infrastructure design with geotechnical solutions for site issues

planning, facilitating and executing the approved strategy

filling and geotechnical specifications for future building foundations

specialist consultant advice in relation to audit, heritage, structural, civil and buildings

client-side representation for the delivery of the works in demolition, decontamination, infrastructure, geotechnical, fill and the EPA audit processes.

Team and system development

Urban Neighbourhoods also managed project workshops functions and managed navigating for the technical, architectural and planning teams. For future stages we developed and created new systems processes for handover to the internal development team, thus ensuring their knowledge capture and systems design were retained in-house.

Site Limitations

A former jeans factory, Bradmill Yarraville had been vacant for 15 years and was heavily contaminated from decades of chemical processing on site.

It had significant contamination from asbestos and PFAS in the buildings, soil and groundwater.

The site required significant demolition and remediation over a 2-year clean up and filling process, before building could commence.

Sustainability benchmarks

Urban Neighbourhoods managed the demolition, remediation and geotechnical works that underpin the master-planned community of 1,000 residential homes, a community centre, parks and open space which is a benchmark for sustainability, and is industry-leading in its outcomes.

The methodology adopted in the remediation and waste stream management process recycled over 95% of the on-site material, while remediating concentrated wastes to designated EPA contaminated waste sites.

In fact, Bradmill Yarraville is aiming for a 6-Star Green Star Communities rating from the Green Building Council of Australia, representing world leadership in social and environmental design.

‘Leaving teams with greater skills and knowledge is an essential part of our process.’

Talk to us about client-side Director Services so you can realise the true value of your investment.

Frasers BurwoodBricks

Master planned community, Middleborough Rd, Burwood East, Victoria

Bradmill Yarraville

Centre for Regional Excellence, Numurkah Road, Shepparton, Victoria

Frasers BurwoodBricks

Riverwalk Werribee: A Master Planned Development